Remember to check the Knowledge Base for a solution before you enter a new ticket.

Four Points Squirrel Server Location

Creation date: 7/23/2019 2:51 PM    Updated: 7/27/2026 8:47 AM   squirrel four points squirrel server location
Argus IT · Squirrel · Technical Reference
Four Points Squirrel Server Location
For the occasions when the server must be power-cycled at the source — and nobody can find it.
Do NOT do this without Squirrel or Argus IT involvement
Power-cycling the Squirrel server on your own can corrupt open transactions and takes integrations offline. This article exists so the server can be found when Squirrel or Argus IT directs a power-cycle — not so it can be restarted casually.
📍  Where it is
Go to the back of the server rack next to the wall — the server is in the first rack.
Open the attached photo below this article (Four Points Squirrel Server Location.jpg) and look for the computer the arrow points to.
🔌  How to power-cycle it (when directed)
1
Press and hold the power button until the unit turns off.
2
Wait 30 seconds.
3
Power it back on.
4
If it will not turn off from the button, pull the power cable as a last resort.
💡 A full server restart takes several processes offline — afterwards, follow Things to Keep in Mind When Rebooting the Squirrel Server (KB-170002) to bring everything back in the right order.
ArgusIT KB# 170006 · Tags: squirrel · four points · squirrel server location